IT Asset Disposition, planned and documented.
A single scoped project for organizations retiring servers, storage, networking and end-user equipment. RTR handles the equipment from intake to final disposition, and reports against the inventory you start with.

Scope
What an ITAD project includes.
Every project is built from the same eight elements. Your scope decides which apply to which equipment.
Retirement planning
Intake and inventory
Secure handling
Sanitization coordination
Testing and grading
Reuse and recovery
Recycling
Documentation
Planning guide
Plan your equipment retirement with confidence.
A well-defined project starts with the right information. Use these three steps to prepare for an equipment refresh, office move, surplus inventory review or technology retirement.
- 01
Build a practical inventory
List equipment types, manufacturers, models, quantities, specifications and known condition. Include the collection location, access requirements and target dates. For buyback assessments, fuller equipment details help RTR evaluate potential value.
- 02
Define data and reporting requirements
Identify data-bearing equipment and your organization’s approved handling requirements. Before the project begins, agree on data sanitization, disposition methods, asset tracking and reporting. Complete internal backup and retention steps before retiring equipment.
- 03
Agree on logistics and next steps
Share your inventory and timeline with RTR. We review project scope, location and access needs, collection arrangements, costs and potential recovery opportunities.
An inventory spreadsheet can be attached to the contact form. Pricing depends on equipment, volume, services, logistics and reporting, so there is no published rate card. For surplus equipment you want assessed for value, see Equipment Buyback.
Sample · fictional data. Download the sample (PDF)
What you receive
Records that match the inventory you started with.
The chain-of-custody record shows each hand-off from transfer to close. The serialized asset report lists what was received and what happened to it. Sample formats use fictional data.
Limits
What is scoped, not assumed.
Turnaround and pricing depend on the project. RTR does not publish guaranteed turnaround times or blanket rates, because both depend on volume, equipment, logistics and reporting.
Not every asset follows every step. A server with drives and a monitor with none follow different paths. Your scope records which.
Large or unusual projects, such as data center decommissioning, are scoped individually, and we will say which parts RTR performs directly.
FAQ
Common project questions.
Can RTR collect equipment from our location?
Yes. RTR can collect equipment. Collection arrangements, access requirements and cost are scoped per project, so tell us where the equipment is located and when it is available. You can also deliver it to the Longwood facility.
Do we receive documentation for every asset?
Reports are agreed before work starts. Serialized reporting depends on the identifiers the equipment carries, and the level of detail is set in the scope.
Can recoverable equipment offset project costs?
Where equipment has market value, recovery can be part of the plan. Value depends on model, condition, quantity and demand, and is never guaranteed.
Plan your ITAD project.
Equipment, location and documentation needs are enough to start.